Tuesday, January 5, 2010
Tying steel, wall demo, and conduit setting...
Today we finished demo of the existing north wall and took the compressor back to PDQ. Continued to tie rebar. The inspector noticed a change in the plans from 8" cmu block to 12" so we are trying to sort that out with Harold our structural engineer. We dug the trench for the Edison's electrical conduit and will have that inspected tomorrow along with a compaction test for the footings and a walkthrough with the structural engineer for a footing design modification.